Demolition of the existing synthetic turf carpet and infill, Type II permeable base and field drainage
system to expose the existing subgrade. Preparation of existing subgrade to receive the new turf system.
Installation of new geotextile fabric, field drainage system, and porous stone base. Coordination and
management of the synthetic turf and infill installation by FieldTurf Installation crew. Installation of
asphalt paving at field perimeter.
Project Documents:
Front-end Bid documents #100-13
Plans & Specifications will be available at Mayer Reprographics, 6331 Nancy Ridge Drive, San Diego, CA 92121
Office: 858-558-1900.
A mandatory pre-bid conference shall be held on February 14, 2013 at 10:30 am at the
RS Building, Facilities Conference Room, RS-5, on the San Marcos campus, 1140 West Mission Road, San Marcos,
CA 92069. Any bid submitted by a Bidder who does not attend the mandatory pre-bid conference shall be
considered a non-responsive bid. Attendance is “Mandatory”. NO EXCEPTIONS. Sign In Sheet