Baseball Field Relocation

View of the baseball field on campus

View of the baseball field from the dugout

Project Delivery Method: CMAR
Project Budget: $10.3 million
Construction Start Date: May 2014
Completion Date: September 2015
Occupy Date: September 2015
Bond Series: A

Scope/Summary:

New baseball field with stadium seating, dugouts, restrooms, press box, and lighted batting cages and bullpens.

Sustainable Features:

  • Natural grass playing surface
  • Artificial turf
  • LED batting cage & bullpen lighting
  • Carved into hillside maintaining surrounding natural habitat and vegetation

Awards: 

  • Statewide Educational Wrap Up Program (SEWUP) Safety Award

Project Team:

  • Architect: Davy Architecture
  • Construction Manager: Swinerton Builders
  • Civil Engineer: SB&O, INC
  • Electrical/Mechanical Engineer: BSE Engineering, Inc.
  • Structural Engineer: KNA Consulting Engineers, Inc.
  • Landscape Architect: Howard Associates
  • Construction & Facilities Planning Manager: Dennis Astl
  • Prop M Construction Manager: John Philipps
  • Furniture, Fixtures & Equipment (FF&E) Supervisor: Eileen Poole